PM Surya Ghar Yojana 2026: ₹78,000 Solar Subsidy and Loan
PM Surya Ghar Muft Bijli Yojana: ₹30,000-78,000 rooftop solar subsidy, the collateral-free solar loan at about 6%, how to apply, and a worked EMI example.

In this article
PM Surya Ghar: Muft Bijli Yojana pays a household up to ₹78,000 (up to ₹85,800 in special category states) towards a rooftop solar system, and public sector banks lend the rest without collateral at about 6% for systems up to 3 kW. As of October 2026, the scheme is active, run by the Ministry of New and Renewable Energy (MNRE) through electricity distribution companies (DISCOMs), with a target of one crore homes by March 2027. You apply on the national portal pmsuryaghar.gov.in, not through an agent.
This guide covers who qualifies, the exact subsidy slabs, how the solar loan works and what it costs, a worked EMI example, and what to do if your subsidy is stuck.
Scheme status in October 2026
The scheme was approved in February 2024 with an outlay of ₹75,021 crore. MNRE reported about 26.2 lakh rooftop installations and nearly ₹17,968 crore of central subsidy released by 19 March 2026. The subsidy is available only under the capital expenditure (capex) model, where you own the system. It is limited to residential consumers. Group housing societies and resident welfare associations get a separate subsidy for common facilities.
Subsidy amounts (as of October 2026)
The subsidy is 60% of the benchmark cost up to 2 kW and 40% of the additional cost from 2 to 3 kW, capped at 3 kW. In rupees:
| System size | Subsidy (general states) | Subsidy (special category states/UTs) |
|---|---|---|
| 1 kW | ₹30,000 | ₹33,000 |
| 2 kW | ₹60,000 | ₹66,000 |
| 3 kW or more | ₹78,000 (maximum) | ₹85,800 (maximum) |
| Group housing society / RWA (common facilities) | ₹18,000 per kW, up to 500 kW | Same |
Special category states and UTs are the North Eastern states including Sikkim, Himachal Pradesh, Uttarakhand, Jammu and Kashmir, Ladakh, Andaman and Nicobar Islands and Lakshadweep. Some states and UTs add their own top-up subsidy; check your DISCOM's page on the portal.
A household that needs about 0-150 units a month is typically suited to a 1-2 kW system, and 150-300 units to a 2-3 kW system. You can install a bigger system, but the subsidy stays capped at the 3 kW amount.
Who is eligible
- The applicant is an Indian citizen and owns the house, with rights to the roof
- The roof has enough shadow-free space for panels (roughly 10 sq m per kW is a common estimate)
- A valid electricity connection in the applicant's name with the local DISCOM
- No other subsidy taken earlier for rooftop solar on that connection
- The system is installed by a vendor registered on the portal, using domestically manufactured modules with domestic cells
Tenants cannot claim the subsidy unless the connection and roof rights are in their name.
The PM Surya Ghar solar loan
Banks offer a dedicated loan so that a household does not have to pay the full cost upfront. The government has said eligible borrowers can get collateral-free loans from public sector banks at around repo rate plus 0.5%. SBI's published terms are a good reference:
| Feature | Up to 3 kW (loan up to ₹2 lakh) | 3-10 kW (loan ₹2-6 lakh) |
|---|---|---|
| Interest rate (SBI, effective 15 Oct 2026) | 6.00% | 8.15% |
| Income proof | Not required | Net annual income of at least ₹3 lakh |
| Minimum CIBIL score | Not specified | 650 |
| Margin (your contribution) | 10% of project cost | 10% of project cost |
| Tenure | Up to 10 years, including 6-month moratorium | Same |
| Security | Hypothecation of the solar system only | Same |
| Processing fee | Nil | Nil |
Rates are floating and linked to SBI's external benchmark, so they move with the repo rate. Other public sector banks have similar products; you can compare and apply through the JanSamarth portal (jansamarth.in) after registering on the PM Surya Ghar portal. The subsidy is credited to your account, and when you take the SBI loan you give the loan account number so the subsidy goes straight into the loan.
Before applying for the larger loan, it helps to check your CIBIL score for free because a score below 650 can block the ₹2-6 lakh slab.
Worked example: 3 kW system with a loan
Assume a 3 kW system costs ₹1,90,000 installed (prices vary by state and vendor; this is illustrative), in a general-category state.
| Step | Amount |
|---|---|
| System cost | ₹1,90,000 |
| Your 10% margin | ₹19,000 |
| Loan at 6% for 10 years | ₹1,71,000 |
| EMI without subsidy | ₹1,898 a month |
| Subsidy credited to the loan | ₹78,000 |
| Loan after subsidy | ₹93,000 |
| EMI on ₹93,000 at 6% for 10 years | ₹1,032 a month |
| Total interest on ₹93,000 over 10 years | about ₹30,900 |
Now the saving side. A 3 kW system in most of India generates around 4 units per kW a day, or about 360 units a month. At an average tariff of ₹6 a unit, that is roughly ₹2,160 a month off the electricity bill, which more than covers an EMI of ₹1,032. Generation, tariff slabs and net-metering rules differ by state, so treat these numbers as illustrative. To make the EMI arithmetic yourself, use our EMI calculator; the logic is explained in how EMI is calculated.
In practice, the subsidy arrives after commissioning, not on day one. Some banks recalculate the EMI after the subsidy is credited and others reduce the tenure, so ask which method your bank uses.
How to apply, step by step
- Register on pmsuryaghar.gov.in: choose your state and DISCOM, enter your electricity consumer number, mobile number and email.
- Log in and apply for rooftop solar with your consumer number and mobile OTP. Fill in the form with the system size you want.
- Wait for feasibility approval from your DISCOM. Do not install before this approval.
- Choose a registered vendor from the portal list and agree on price and warranty in writing. Get the quotation and site feasibility report, which you will need for the loan.
- Apply for the loan (optional) through JanSamarth or your bank, with KYC, an electricity bill, the vendor quotation and, for loans above ₹2 lakh, PAN and income proof.
- Installation: the vendor installs the plant. Submit plant details on the portal and apply for a net meter.
- Inspection and commissioning: the DISCOM installs the net meter, inspects the plant and generates the commissioning certificate on the portal.
- Submit bank details and a cancelled cheque on the portal. The subsidy is then credited to your bank account (or loan account).
Common reasons the subsidy is rejected or stuck
- Installation before DISCOM feasibility approval
- Vendor not registered on the portal, or modules that are not domestically made
- Name on the electricity connection different from the applicant or bank account
- Net meter not installed or commissioning report pending with the DISCOM
- Previous solar subsidy already taken on the same connection
- Wrong bank details or an inactive account
How to complain
- Portal grievance: raise a complaint from your login on pmsuryaghar.gov.in. Track it there.
- DISCOM: for feasibility, net meter and inspection delays, write to your DISCOM's rooftop solar cell or consumer grievance forum.
- Bank: for loan issues, use the bank's grievance channel. If unresolved after 30 days, file with the RBI Integrated Ombudsman at cms.rbi.org.in.
- CPGRAMS: pgportal.gov.in, addressed to MNRE, for unresolved scheme issues.
Watch out for fake websites and agents
Fake "Surya Ghar registration" sites and callers ask for a fee to "approve" your subsidy. Registration on the national portal is free, and the subsidy is paid only into your own bank or loan account. Never share OTPs or pay a "processing" or "approval" fee to anyone. Report fraud at cybercrime.gov.in or call 1930. Our guide to how to spot investment and scheme scams lists the common warning signs.
Key takeaways
- As of October 2026, PM Surya Ghar is active with a subsidy of ₹30,000 (1 kW), ₹60,000 (2 kW) and ₹78,000 (3 kW and above); special category states get up to ₹85,800.
- Public sector banks offer collateral-free solar loans; SBI charges 6.00% up to ₹2 lakh and 8.15% for ₹2-6 lakh, with a 10% margin and up to 10 years.
- Apply only through pmsuryaghar.gov.in, wait for DISCOM approval, and use a registered vendor.
- In the illustrative example, the subsidy cuts the EMI from about ₹1,898 to ₹1,032, below the expected monthly bill saving.
- Subsidy is released after the net meter and commissioning; most delays are at that stage.
- Never pay agents for registration or subsidy approval.
Frequently asked questions
How much subsidy is given under PM Surya Ghar Yojana?
As of October 2026, the central subsidy is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger, which is the maximum for a household. In special category states and UTs such as the North East, Himachal, Uttarakhand, J&K and Ladakh it is ₹33,000 per kW for the first 2 kW and ₹19,800 for the third kW, up to ₹85,800.
What is the interest rate on the PM Surya Ghar loan?
Public sector banks offer collateral-free solar loans linked to the repo rate. SBI's rate effective 15 October 2026 is 6.00% for loans up to ₹2 lakh and 8.15% for ₹2-6 lakh, for up to 10 years. Rates are floating, so confirm the current rate with your bank.
Who is eligible for PM Surya Ghar subsidy?
An Indian household that owns a house with a roof suitable for solar panels, has a valid electricity connection in its name, and has not taken any other subsidy for rooftop solar. The panels must be installed by a vendor registered on the national portal and must use domestically made modules and cells.
Do I get 300 units of free electricity?
Not as a cash benefit. 'Muft bijli' means a 2-3 kW rooftop system can generate around 300 units a month or more, which can cut the bill to near zero for a household using that much. Actual generation depends on location, shading and season.
How long does it take to get the subsidy?
The subsidy is released after the DISCOM inspects the plant, installs the net meter and issues the commissioning report, and you submit bank details on the portal. Delays usually come from net-meter installation or mismatched bank details.
Is PM Surya Ghar scheme still open in 2026?
Yes. As of October 2026 the scheme is active, with a target of 1 crore households by March 2027. Over 26 lakh rooftop systems had been installed by March 2026, according to the Ministry of New and Renewable Energy.
This article is for general education and is not personalised financial, tax or legal advice. Rates and rules are as of 26 Oct 2026; confirm current terms with your lender, AMC or a qualified adviser.